top of page
Search

Pumps Fail Due to Scale - Sometimes Often

5 hours ago
1 min read

Chemicals are the answer most turn to - we like that challenge


Situation: Sump pump without chemical feed introduction will fail within 7 days due to precipitation build-up. 4" discharge line will completely foul in a similar time frame. Rebuilds and pipe cleaning or replacement are the least of worries, when liquids need to keep moving. The work was horrible and monotonous, plus pricey.


The Solution: One (1) tote of chemicals per month injected into the well. Costly.


The MORE LOGICAL Solution: One (1) FlowScience Dual Pipe & Pump Defender.


The Results to Date: Flowscience dual channel Pipe and Pump Defender Installed. Chemicals SHUT OFF.


6-months - no pump pulls, no loss in flow.


At Flowscience we can't guarantee to be the silver bullet, but heck, sometimes we're real close to that association.


How are your pumps doing in the field?



 
 
 

Comments


Solutions

Projects

How scale forms

Silica scale control

Leachate scale control

Carbonate scale prevention

Carbonate scale removal

Chemical free scale control

© 2026 by Simple Online for FlowScience All Rights Reserved

bottom of page