top of page

FLOWSCIENCE LEACHATE SCALE CONTROL SYSTEMS
Attach to the exterior of all types of pipe, pumps from steel to dual walled HDPE. Non-intrusive to operations and replaces the need for chemicals, acids and jetting permanently
HOW LSC PIPE TREATMENT SYSTEMS WORK
1
Locate and specify LSC systems
Utilizing the site drawings and knowledge of where scaling forms we create a design plan and quote. All can be performed remotely


.png)
2
Dropship and Install
In as little as 2 weeks from design finalization LSC systems can arrive on site with OEM for easy custom installation by your personnel
Typical 6" Pipe Treatment Pad Set-up

3
Power up and follow the 6-week monitoring plan
LSC systems start working in as little as 20 minutes from powering up. Existing scale will break down and will need proper best practice monitoring. Ongoing maintenance is all about keeping an eye on conditions and flow and regular system checks to ensure they're operating

bottom of page